ASCO Series 165 185 300
Application Residential Res./Light Com. Commercial
Start Control 4-Wire(1) 2-Wire 2-Wire
Memory Battery Yes Yes Yes
Service Entrance Rated No Optional Optional
Restore Power <30 Sec <30 Sec <10 Sec
Momentary Utility Failure Delay 3 Sec Adj 1 or 3 Sec Adj 0-5 Min
Generator Cooldown 1 Min Adj 2-5 Min 5 Min
Exercise Period 14 Day 7 Day 7 Day
Exercise Time 20 Min 20 Min 20 Min
Exercise on Load Selectable Selectable Selectable
Transfer To Emergency Delay 15 Sec 10 Sec 0-5 Min
Cool Down Delay 1 Min 2-5 Min 5 Min
Utility Retransfer Delay 5 Min 5 Min Adj 0-30 Min
Standard Auxiliary Contacts No No Yes (1 Set)
UL Listed 1008 1008 1008
NFPA 110 Level 1 (2) No No Yes
Electrical Features
Available Voltages 240V, 60Hz 1-Ph 240V 60 Hz 1-Ph ≤600V 1/3-PH
Available Poles 2 2 2-4
Amperage Range 100-200 100-400 30-3000
Normal Voltage Pick-Up 204V Adj 198-209V Adj 90-95% Nominal
Normal Voltage Drop-Out 180V Adj 176V or 198V Adj 70-90% Nominal
Frequency Pick-Up 57 Hz 57 Hz 95% Nominal
Frequency Drop-Out 54 Hz 51 Hz 85% Nominal
Enclosure Options
NEMA 1 Yes Yes Yes
NEMA 3R Yes Yes Yes
NEMA 4 No No Yes
NEMA 4X No No Yes
NEMA 12 No No Yes
Accessories
Strip Heater No K732212-003 44A(Ext) 44G (Load)
Auxiliary Contacts No 14A/14B (3)S 14AA/14BA
Connectivity Module No Yes Yes
Programmable Engine Exerciser No No (11BG)
Remote Annunciator Kit No Yes Yes
Remote Control
Remote Test Switch Terminals No Yes Yes
Remote Auto Transfer Terminals No Test Test and Peak Shaving
Remote Time Delay Bypass Termal No Yes Yes
Notes: (1) For use with WINCO air-cooled Packaged Standby Generators only. (2) Consult factory for NFPA
110 Level 1 compliant generators. (3) Standard 260-400A.
Automatic Transfer Switches
A high quality automatic transfer switch (ATS) is necessary to safely install an emergency generator. The ATS is
designed to prevent the generator from back feeding the utility and to protect the generator when utility power is
restored. WINCO recommends ASCO switches for our generators because over the years they have been proven in
eldapplicationstoworkwhenyouneedthemmost.
Complete Circuit Backup Emergency Circuit Backup
ATS
SE ATS
ATS
Utility Meter Utility Meter Utility Meter
Emergency
Circuits
Non-Essential
Circuits
Distribution
Panel
Distribution
Panel
Service
Disconnect
The ATS is installed between the main
distribution panel and the emergency
distribution panel. Only emergency circuits are
powered by the generator during an outage.
A service entrance rated ATS is installed
between the utility meter and the main
distribution panel. All circuits are powered by
the generator.
A non-service entrance rated ATS is installed
between the service disconnect and main
distribution panel. All circuits are powered by
the generator.
Typical Installations
There are three common
installation methods for automatic
standby generators. Proper
installation depends upon each
application and local ordinances.
Powered By Utility Only
Always Powered (Gen+Util)
Generator Output
DC Control Wires
Key
ASCO 165
ASCO 185
ASCO 300
12